Posted February 4, 2016 Just noticed construction photos of two Spartan chassis rigs under construction by SVI. Listed as going to Phoenix. Replacement squads? Haz Mat? https://www.dropbox.com/sh/sou7nr6levcu7v7/AABJ3wjEh1WKGd4LiAqR7uhEa/Cab-Chassis?dl=0 Share this post Link to post Share on other sites
Posted February 4, 2016 remounts of old ALF units only Share this post Link to post Share on other sites
Posted February 4, 2016 remounts of old ALF units only Correct. All three Squads are being remounted and 'should' be road worthy at the end of March. Share this post Link to post Share on other sites
Posted February 4, 2016 Wonder why they didn't go with Pierce? Share this post Link to post Share on other sites
Posted February 4, 2016 Why purchase something new? The boxes are good, but the ALF chassis are crap! Share this post Link to post Share on other sites
Posted February 5, 2016 (edited) Pierce's price was a lot more and SVI gave them a really good deal, I'm surprised they are doing all 3 at once, Edited February 5, 2016 by GilbertFIRE Share this post Link to post Share on other sites
Posted February 5, 2016 So what is 29s running? 8 & 44 have the E-One Tridents. Share this post Link to post Share on other sites
Posted February 5, 2016 Since SQ29's crew is at Station 72 staffing E929 until 72's gets a dedicated crew I would guess nothing Share this post Link to post Share on other sites
Posted February 5, 2016 So what is 29s running? 8 & 44 have the E-One Tridents. SQ29 is at FS72 and they cross man E929. Basically E929 is ST29 without the hazmat or TRT equipment Share this post Link to post Share on other sites
Posted February 5, 2016 (edited) The same way Tempe crossman's E278/SQ278 Any word when Phoenix will start building new fire Station's again 55 is already designed & 74 were the next stations that were suppose to be built until they stopped Edited February 5, 2016 by GilbertFIRE Share this post Link to post Share on other sites
Posted February 5, 2016 The same way Tempe crossman's E278/SQ278 Yes except SQ278 is not hazmat. Only TRT Share this post Link to post Share on other sites
Posted February 5, 2016 Pierce's price was a lot more and SVI gave them a really good deal, I'm surprised they are doing all 3 at once, pretty sure they are not all at once. But of course thats what I am told - I do not live there. Share this post Link to post Share on other sites
Posted February 5, 2016 pretty sure they are not all at once. But of course thats what I am told - I do not live there. Correct. Although there will be some overlap, they majority of the remount will be spaced out. Share this post Link to post Share on other sites
Posted February 18, 2016 Correct. Although there will be some overlap, they majority of the remount will be spaced out. yep I know that Share this post Link to post Share on other sites
Posted February 19, 2016 I heard Squad 29 on a call earlier this week, so I believe theirs will be last to get refurbished. Share this post Link to post Share on other sites