Posted August 24, 2020 Mesa Fire & Medical is getting 6 Horton 623 Type 1 Ambulance increasing Mesa to 12 Ambulance's Also Station 221 will be built by Core Construction @ Point Twenty Two & Pasteur and will be a 12,000sqft 4 Bay Station Future Station 223 is planned for on Signal Butte between Ray Rd to Future SR24 Gateway Freeway interchange Share this post Link to post Share on other sites