Posted May 12, 2018 Has anyone seen how they are doing on the project of building new fire station 39 at 14615 Oxnard. Is the target date for openng the new station still set for March of 2019 are they moving it up? Share this post Link to post Share on other sites
Posted May 13, 2018 I drove by the new location Wednesday, and they were in the cinder block stage of construction. Share this post Link to post Share on other sites
Posted May 13, 2018 (edited) Will the new Station 39 have a storage bay for reserve apparatus? Edited May 13, 2018 by RicardoBerg Share this post Link to post Share on other sites
Posted May 16, 2018 On 5/12/2018 at 9:33 PM, RicardoBerg said: Will the new Station 39 have a storage bay for reserve apparatus? No, this is a standard station (Task Force, Rescue and BC). It sits on one acre and covers 15K square feet. Share this post Link to post Share on other sites
Posted May 18, 2018 How come the squad was never returned after engine 7 moved out of 39s ? Share this post Link to post Share on other sites
Posted May 18, 2018 Artist rendering of the new FS 39. From the Prop.F report Share this post Link to post Share on other sites